亚洲成在人线av壁咚影院_手机激情视频国产乱伦_国产在线19禁免费观看_久久aⅴ无码av高潮白浆_人与动另类z0z0欧美视频_国产午夜精品福利三级_色呦呦 日本在线观看_性巴克瑟瑟免费网站_132775大但人文艺术_亚洲中文有码字幕日本

涼茬機(jī)設(shè)備調(diào)節(jié)以及部件說(shuō)明分析

發(fā)布于:2022-07-07 17:31:33  來(lái)源:http://xgbmw.cn

涼茬機(jī)設(shè)備調(diào)節(jié):
Adjustment of stubble Cooler:
1.設(shè)備:本系列產(chǎn)品半濕物料破碎機(jī)出廠設(shè)置時(shí)會(huì)下列一部分:a.半濕物料破碎機(jī)行為主體,服務(wù)器包含外殼、電機(jī)轉(zhuǎn)子構(gòu)造;b.主電機(jī)一臺(tái),配有皮帶盤(pán)一件;c.附注:三角帶、鄂板等。
1. Equipment: the factory setting of this series of semi wet material crushers will include the following parts: a. the main body of the semi wet material crusher, and the server includes the shell and motor rotor structure; b. One main motor with one belt pulley; c. Note: triangle belt, jaw plate, etc.
2.調(diào)節(jié):酒糟涼茬機(jī)出廠設(shè)置前已調(diào)節(jié)過(guò),并根據(jù)嚴(yán)格的品質(zhì)技術(shù)標(biāo)準(zhǔn),檢查合格后出廠設(shè)置,但是因?yàn)楫?dāng)場(chǎng)的檢修或工作中應(yīng)用后出現(xiàn)的難題仍要調(diào)節(jié)。
2. Adjustment: the distiller's grains stubble cooler has been adjusted before leaving the factory, and it will be set after passing the inspection according to the strict quality and technical standards. However, it still needs to be adjusted because of the problems after on-site maintenance or application in work.
涼茬機(jī)部件說(shuō)明:
Description of stubble cooler components:
涼茬機(jī)生產(chǎn)流程苞米→泡糧→初蒸→悶水→復(fù)蒸→攤晾下曲→培菌糖化→配糟入窖→發(fā)醇→分餾→制成品。
Production process of stubble Cooler: corn → soaking grain → initial steaming → stuffy water → re steaming → spreading and drying starter → cultivating bacteria and saccharifying → preparing grains into cellar → alcoholization → fractionation → finished products.
蒸糧工藝流程
Grain steaming process
(1)泡糧純谷物制酒設(shè)備打茬機(jī)哪家強(qiáng)泡糧時(shí)要先水后糧。先放人90℃左右的開(kāi)水(糧水占比約為1:
(1) Soaking grain pure grain wine making equipment stubble machine which strong soaking grain should be water before grain. First put boiling water at about 90 ℃ (grain water accounts for about 1:
(2)涼茬機(jī)加上糧拌和。泡水溫度為73~74℃,70℃。
(2) The stubble cooler is added with grain for mixing. The soaking temperature is 73 ~ 74 ℃, 70 ℃.
泡糧時(shí)間:冬天3~4鐘頭,不銹鋼全自動(dòng)涼茬機(jī),夏天1~1.5鐘頭。放泡水后人甑的干發(fā)時(shí)間要?jiǎng)?wù)求減少,涼茬機(jī),有標(biāo)準(zhǔn)的能夠減少10鐘頭之內(nèi)。泡糧后讓其滴干,隔日早上上甑前用涼水浸洗,去除酸水,滴干后裝甑。
Soaking time: 3 ~ 4 hours in winter, stainless steel automatic stubble cooler, 1 ~ 1.5 hours in summer. It is important to reduce the hair drying time from soaking water to human steamer. Stubble cooler can be reduced to less than 10 hours if there is a standard. After soaking the grain, let it drip dry. Soak it with cold water in the morning of the next day, remove the sour water, and then put it into the steamer after dripping dry.
全自動(dòng)涼茬機(jī)
(3)涼茬機(jī)初蒸(別名干蒸)撮糧人甑圓氣的時(shí)間宜短,一般不*出50分鐘,從圓汽具有滲悶水止的初蒸時(shí)間維持2~2.5鐘頭。初蒸的目地是苞米顆粒物遇熱,吸水能力強(qiáng),大米涼茬機(jī),減少煮糧時(shí)間,木薯淀粉外流。
(3) The initial steaming (also known as dry steaming) of the stubble cooler should take a short time from the grain steamer to the round steam, generally no more than 50 minutes, and the initial steaming time from the round steam to the stuffy water can be maintained for 2 ~ 2.5 hours. The purpose of initial steaming is to reduce the cooking time and the outflow of cassava starch due to the strong water absorption capacity of bract rice particles in case of heat.
(4)涼茬機(jī)悶水(或稱(chēng)悶糧)悶水份2次摻入:次從甑面摻入,時(shí)間為6~10分鐘,不必太慢,使摻水后甑面溫度達(dá)72~73℃,不出75℃,70℃,水流量摻到距次必須摻到的水位15~20公分為宜。
(4) Cool stubble machine stuffy water (or grain stuffy) stuffy water is mixed twice: it is mixed from the steamer surface for 6 ~ 10 minutes, not too slow, so that the steamer surface temperature reaches 72 ~ 73 ℃, less than 75 ℃, 70 ℃, and the water flow is 15 ~ 20 cm away from the water level that must be mixed.
全自動(dòng)涼茬機(jī)廠家提醒,抽濾重力鑄造磨輥均做動(dòng)平衡機(jī),運(yùn)行穩(wěn)定,應(yīng)次用70℃冷卻器水從甑底摻入,摻水時(shí)甑面溫度比底層高,摻水時(shí)間為20~30分鐘。
The manufacturer of full-automatic stubble cooler reminds that the suction filtration gravity casting grinding roller is used as a dynamic balancing machine, and the operation is stable. 70 ℃ cooler water should be used to mix from the bottom of the steamer. When mixing water, the temperature of the steamer surface is higher than that of the bottom, and the mixing time is 20 ~ 30 minutes.
以上就是問(wèn)題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對(duì)這一問(wèn)題還存在任何疑問(wèn),都?xì)g迎關(guān)注我們網(wǎng)站http://xgbmw.cn并咨詢我們的工作人員,將竭誠(chéng)為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://xgbmw.cn And consult our staff, will serve you wholeheartedly.

咨詢熱線:
0537-4556677